Thursday, November 02, 2006

Pool update, getting close

Things are moving fast. The fountain is in and cemented, the forms are down for the cement patio, the pad is down for the cabana that will hold the equipment and have bar windows and stools. The rockery is done and set into the hill and the fence posts are installed. The water pipes and electrical conduit are also installed under the ground.

The cement decking around the pool is scheduled for Monday - and then the only big things left are backfilling the gaps behind the rocks and waterfall and putting the chainlink on the fence posts (black chainlink is almost invisible and will keep our little fuzzy muffins in where they are suppose to be) - then I think the water goes in!!! The cabana needs to be built, the equipment needs to be installed, and the electrical needs to be put in - but all that stuff doesn't need any heavy equipment. We will wait until spring to have the propane guys come and install tanks for the heater.